News

Plastic Extruder Maintenance Focus!

Pulished on Apr. 22, 2021


Plastic Extruder Suppliers share with you


Plastic Extruder Equipment

Plastic Extruder Equipment


1, The Plastic Extruder Equipment should be placed in a ventilated position to ensure that the motor work heat dissipation to extend its life; machine should be kept well grounded.


2, Regular inspection of the tool screws, the new machine after 1 hour of use, with tools to tighten the moving knife, fixed knife screws, to strengthen the blade and knife frame between the fixed; should be regularly filled with lubricant bearings to ensure the lubrication between the bearings; to ensure the sharpness of the cutter, should always check the tool, to ensure its sharpness, to reduce unnecessary damage caused by the blade blunt lack of other parts; regularly check whether the belt is loose, and timely adjustment. Tighten it in time.


3, Restart - before starting for the second time, the remaining debris in the machine room should be removed to reduce the starting resistance. Should periodically open the inertia cover and pulley cover to clear the flange below the ash outlet, because the crusher room discharge powder into the shaft bearings.


4, Replacement parts - when replacing the tool, the gap between the moving knife and the fixed knife: 0.8MM for crushers above 20HP is good, and 0.5MM for crushers below 20HP is good. The thinner the recycled material is, the clearance can be adjusted appropriately.


The company also provides Plastic Products Production Line, if you need, please feel free to contact us!


+86 188 6272 8810
  • Contact: Angella.JI
  • Skype: Angella.JI
  • Mob. : +86 188 6272 8810
  • WeChat: +86 188 6272 8810
  • WhatsApp: +86 188 6272 8810
  • E-mail: sales@bogdamachine.com
  • Add1: No.1 Danfeng North Road, Haian City, Nantong, Jiangsu Province, China
  • Add2: No.5, Shuangfeng Road, Development of Zhaofeng, Leyu Town, Zhangjiagang City, Jiangsu Province, China